Hardware:
10 Dell, IBM, Toshiba PC and Laptops One 96-processor Xeon Cluster (in operation since 2002) One shared SGI Altix with 12 Itanium Processors (in operation since 2003) One 64-processor Opetron high speed cluster (in operation since July 2004) One 100-processor high speed cluster (currently in construction and expected to operate in Sept. 2008) (* The computer clusters were built by our group.)
Matlab Mathematica
|
| |||